The Buffalo Bisons and Sports Construction Group will lay 94,700 square feet of fresh Kentucky Blue Grass starting TODAY at Coca-Cola Field. The placement of the sod onto the field marks the final steps in the team’s two-month field drainage project.
Media are welcome to film the work being done by Sports Construction Group. Work has already begun and is expected to run throughout Wednesday and into Thursday. The process to replace Coca-Cola Field’s 23-year old drainage system began in early September. Sports Construction Group installed a state-of-the-art, vertically drained, sand-based playing field commensurate with those found at the highest levels of professional baseball. This new system will be capable of draining up to 10” of rainwater per hour.
Subscribe to:
Post Comments (Atom)
1 comment:
[url=http://www.uggbootssalele.co.uk/]http://www.uggbootssalele.co.uk/[/url] mgqwl [url=http://www.abercrombieukka.co.uk/]abercrombie and fitch[/url] hkjoa [url=http://www.monclerukco.co.uk/]moncler jackets[/url] jngjw [url=http://www.thomassabojewelleryy.co.uk/]thomas sabo[/url] vpxiu
Post a Comment